火甲水库双重拱坝裂缝成因分析
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV642.4+2

基金项目:


Cause analysis of cracks in dual arch dam of Huojia reservoir
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    火甲水库一副坝是一座双重拱坝,1980年建成投入运行,运行不久,第一重拱坝下游面出现了3条竖向裂缝。为了分析裂缝的成因,采用限元分析方法分析不同荷载组合下拱坝的位移及应力,揭示拱坝裂缝的成因。研究表明:坝体过于单薄,坝体的拱圈和拱梁的刚度不足,温升和温降时坝体出现径向的往复变形,两者是一重拱坝出现裂缝的主要原因。

    Abstract:

    The first auxiliary dam of Huojia Reservoir is a dual arch dam.It was built and put into operation in 1980.Shortly after operation,three vertical cracks appeared on the downstream surface of the first arch dam.In order to analyze the causes of cracks,the finite element analysis method is used to reveal the causes of cracks in arch dams by analyzing the displacement and stress of arch dams under different load combinations.The research shows that the dam body is too thin,the stiffness of the arch ring and arch beam of the dam body is insufficient,and the radial reciprocating deformation of the dam body occurs when the temperature rises and falls,both of which are the main causes of cracks in a heavy arch dam.

    参考文献
    相似文献
    引证文献
引用本文

周威剑,张兆林,覃 培,田 彪,张小飞.火甲水库双重拱坝裂缝成因分析[J].江西水利科技,2023,(1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-03-09
  • 出版日期:
文章二维码