东江河源至石龙主要枢纽补建鱼道设计参数研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV135

基金项目:


Research on design parameters of supplementary fishway in major hub from Heyuan to Shilong of Dongjiang river
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对已建水利工程影响河流连通性问题,补建过鱼设施是解决该问题的重要措施。本文结合木京、沥口和剑潭电站枢纽运行特征,从过鱼目标、鱼道进出口水位和设计流速等方面进行分析,并提出鱼道进出口水位、流速等基本参数,为三个水利枢纽工程补建鱼道提供技术参考。

    Abstract:

    In view of the influence of existing water conservancy projects on river connectivity,the construction of fishcrossing facilities is an important measure to solve this problem.Based on the operation characteristics of Mujing,Likou and Jiantan power station hubs,this paper analyzes the target of passing fish,the water level of inlet and outlet of fishway and the design flow rate,and put forward the recommended values of water level and velocity at the inlet and outlet of the fishway,which provides technical parameters for the construction of fishway in Mujing,Likou and Jiantan.

    参考文献
    相似文献
    引证文献
引用本文

刘永安,刘 霞.东江河源至石龙主要枢纽补建鱼道设计参数研究[J].江西水利科技,2022,(6):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-01-13
  • 出版日期:
文章二维码