基于FLOW-3D的尾矿库数值模拟对下游影响研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD926.4

基金项目:


Study on the downstream impact of the numerical simulation of tailings library based on FLOW-3D
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为研究尾矿库溃坝后对下游村庄的影响,通过对比采取工程措施前后监测点水位及通过断面的流量流速变化,分析采取工程措施的有效性及必要性.本文以某实际尾矿库为例,通过FLOW-3D软件进行三维数值模拟,建立了尾矿库及其下游3km范围内的实体地形及房屋和村庄三维数值模型,对尾矿库逐渐溃坝的动态过程进行了模拟计算;并在原尾矿库模型的基础上,在坝脚处增加一拦河坝,对比分析溃坝对下游的影响.结果显示:采取工程措施后,监测点水位明显降低,断面流量流速均有所减缓,并且推迟了出现最大流量流速的断面时间,证明采取工程措施是有效的.

    Abstract:

    In order to study the impact of tailings reservoir dam failure on downstream villages,the effectiveness and necessity of engineering measures are analyzed by comparing the changes in the flow rate of the point before and after the engineering measures are taken and the flow rate through the section.In this paper,an actual tailings reservoir is used as an example to simulate three-dimensional numerical values through FLOW-3D software.Taking a tailings reservoir as an example,a three-dimensional numerical model of the physical terrain and houses and villages within 3 km of the tailings reservoir and its downstream is established,and the dynamic process of the gradual dam failure of the tailings reservoir is simulated.And on the basis of the original tailings reservoir model,a dam is added at the foot of the dam to compare and analyze the impact of dam failure on the downstream.The results showed that after the engineering measures were taken,the water level of the monitoring point decreased significantly,the flow rate of the section flow slowed down,and delays the section time at which the maximum flow rate occurs.It is proved that the engineering measures are effective.

    参考文献
    相似文献
    引证文献
引用本文

梁 萱,曾智超.基于FLOW-3D的尾矿库数值模拟对下游影响研究[J].江西水利科技,2021,(1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-03-31
  • 出版日期:
文章二维码