Abstract:Based on summarizing the application of concrete cutoff wall construction technology of 3 heads small diameter deep mixing pile cut off wall secondary wall forming method in several dyke body concrete cutoff wall,the drill and gunite mode of stir head have been improved.Engineering practice shows that the improving stir head could reduce stir head’s drilling torsion effectively,and make wall forming soil and cement slurry stirred uniformly,fully.It should be popularized.