Taking the project of Wuxikou Hydro-Junction as an example,this paper introduces the design points of special measures such as discarded residues retaining,slope protection and drainage of soil and water conservation,and puts forward various measures according to local conditions.This paper analyzes the construction characteristics of the measures in the actual construction process,discusses the existing problems and countermeasures in the construction,fully understands and deals with the problems in the construction,and provides reference for the design of the soil and water conservation construction plans.