Abstract:To establish the dam prototype observation model can effectively fit and predict the dam safety monitoring amount. Based on the dam long series of observations and Monitoring analysis, BP neural network, regression and multiple regression analysiswere fitted. The results showed that the fitting effect of BP neural network is better than stepwise regression, stepwise regression is better than multiple regression.