浅谈肯尼亚北马赛奥雅水电站EPC合同模式中承包商的风险及预防
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

F284

基金项目:


Discussion on the risk and precaution taken by contractors in EPC contract model at the North Mathioya hydropower station in Kenya
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    EPC合同模式的最大优点就是可以大大缩短工程从规划、设计到竣工的周期,同时业主对费用的控制有效。这种模式要求承包商像传统模式中的业主一样,对项目的整个建设周期内的工期和成本进行严格管理,并承担实施过程中的风险;要求承包商在投标、合同谈判、实施的全过程中对外部风险及内部风险进行有效辨识和预防,以保证项目的顺利运行和承包商自身利益。

    Abstract:

    The biggest advantage of EPC contract model is that it can shorten the construction period from planning and design to completion, and simultaneously validate client’s effective control of money. In this model the contractor is required to strictly manage the construction period and cost during the whole project lifecycle and responds to the risks in this process, as the client do in the traditional model; it’s also required that the contractor identify inner and outer risks in the procedure of tendering, contract negotiation and implementation and take precautions to ensure successful running of the project as well as their own interests.

    参考文献
    相似文献
    引证文献
引用本文

周利珍,刘瑞林.浅谈肯尼亚北马赛奥雅水电站EPC合同模式中承包商的风险及预防[J].江西水利科技,2016,(6):457-461

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-02-22
  • 出版日期:
文章二维码