    摘要:

    输变电工程的建设会造成沿线地区的水土流失,为了更好的开展输变电工程的水土保持工作,提高水土保持防治效果,本文以投入运行5年的赣州南500kV输变电工程为例,分析赣南输变电工程水土流失的特点,总结了水土保持设计建设运营管理的做法和经验,为今后同类项目的水土保持工作提供参考。

    Abstract:

    The power transmission project construction causedserious soil erosion. In order to better conduct soil and water conservation and improve the effect of soil and water conservation, the case of Ganzhou South 500KV power transmission project of five year service was used in this paper. The figures of the soil and water loss were analyzed, the experience and management practices in soil and water conservation design were concluded, and the results of this paper provided a reference for soil and water conservation in the similar projects.

    参考文献
    相似文献
    引证文献
引用本文

秦晓蕾,喻荣岗,李国辉,张添.赣南输变电工程水土保持工作的做法 及成效初探[J].江西水利科技,2016,(5):388-390

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-01-05
  • 出版日期:
文章二维码