    摘要:

    为评价南昌市大飞机项目填方工程的河道采砂对防洪的影响,根据江西赣江下游尾闾河道特点,采用二维水动力学模型,对采区处的水位、流速等水力要素进行求解和率定.结果表明:采砂工程实施后,由于该河段设计情况下由湖洪控制,其水位最大降低值为 0. 017 m,流速最大变化值在 0. 20 m/ s以内,水流动力轴线仅在采区局部河段有一定调整.采砂工程对行洪安全的影响是局部的、有限的。

    Abstract:

    To evaluate the flood control impact of sand mining project on embankment project of large aircraft in Nanchang ,based on the characteristic of on tail reach of the lower Ganjiang River,combined with the requirements of the sand mining project in river,2D hydraulic model was used to solve and calibrate water level, flow rate, and other factors at the mining area. The results show that after the project is implemented, because the design of the case is under lake flood control , so its biggest lowering of water level is 0.017m, the maximum change of flow rate is within 0.20m /s, the flow dynamic axis only have a local adjustment in the mining area. It is indicated that the sand mining project had a partial, limited influence on the flood control safety.

    参考文献
    相似文献
    引证文献
引用本文

罗蔚,陈龙.某工程河道采砂对防洪评价影响的二维数值模拟[J].江西水利科技,2015,(6):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-04-21
  • 出版日期:
文章二维码