水利工程冬季混凝土施工探讨
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV521

基金项目:


Discussion on winter concrete construction of water conservancy projects
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    水利工程冬季混凝土施工主要受冻融循环的影响,导致混凝土构件性能下降,影响水利工程质量.本文针对冻融循环的特点,分析冬季条件下混凝土作业施工的要点,对混凝土施工提出若干要求.针对冬季低温环境特点,分析混凝土养护方法.最后对水利工程混凝土施工质量控制进行分析,并提出施工质量管理体系建立和质量管理的过程控制.

    Abstract:

    The winter concrete construction of water conservancy projects is mainly affected by freezing and thawing cycle.This results in the performance degradation of concrete member and affects the quality of water resources projects.Aimed at the characteristics of freeze-thaw cycle,the main points of winter concrete construction is analyzed and some requirements proposed.Aimed at the characteristics of low temperature environment in winter ,the concrete curing method is stated .Finally,the construction quality control of hydraulic engineering concrete is analyzed and the establishment of construction quality management system and the process control of quality management are put forward.

    参考文献
    相似文献
    引证文献
引用本文

陈伟,乐瑞.水利工程冬季混凝土施工探讨[J].江西水利科技,2015,(5):380-382

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-01-05
  • 出版日期:
文章二维码