Abstract:Wind power has been paid great attention by our country in recent years,which is a kind of clean energy.The implementation of wind power farm project in Poyang Lake District may induce inevitably serious soil and water loss because soil and vegeatation may be destroyed or disturbed in construction period.By taking master temple wind power project as an example and combined with the concrete features of the project,the partitive and reasonable allocation of engineering measures,plant measures and temporary measures was made in order to control effectively soil and water loss.