Abstract:The comprehensive analysis and evaluation on the effects of anti-seepage are presented in this paper since the dam of Xingfu Reservoir was reinforced,based on the construction quality detection data of the cutoff wall and the leakage monitoring results of Xingfu Reservoir.Furthermore,the application effects of hydraulic grab in building cutoff wall process on Xingfu Reservoir was stated.