樟涧水库除险加固工程临时围堰的设计与施工
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Construction and design of the temporary cofferdam for zhangjian Reservoir Reinforcement Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    樟涧水库除险加固工程中,临时围堰施工时遇到较深的淤泥质流砂土层,围堰的设计与施工无法完全满足规范要求。经方案比较,采用挤压法施工临时围堰,不仅施工进度快、运行安全,而且满足了工程工期要求,又降低了施工成本,可供类似工程参考。

    Abstract:

    The deep silt sand soil was encoutered in constructing temporary cofferdam for Zhangjian Reservoir Reinforcement Project.The design and construction of the cofferdam cannot fully meet the requirements of specification.By scheme comparison,the extrusion method is adopted to construct tempory cofferdam.It has the characteristics such as fast construction progress and safety operation.It meet the requirement of time limit for the project and reduce construction cost.It can be referred for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

王藤璋,徐旺敏,张华,陈春柏.樟涧水库除险加固工程临时围堰的设计与施工[J].江西水利科技,2015,(3):182-185

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-01-05
  • 出版日期:
文章二维码