Abstract:At present,the determining methods of land requisition compensation unit price for hydraulic and hydropower projects in our country have the method of 16 times and the method of the same price for the same land.The determining basis and calculation method of this two methods for hydraulic projects in Jiangxi province are introduced.This two methods were adopted to measure,compare and analyze the land requisition compensation standard on the same project.The countermeasure and suggestion of determining the land requistion compensation unit price is proposed in order to provide reference for policy formulation and revision.