Abstract:Based on the sediment condition of the control station of main rivers in the upstream of Wanan Reservoir and the reservoir outlet station and compared the inlet sediment with the outlet sediment before the construction of this reservoir,the sediment accumulation condition after the construction of this reservoir is analyzed.Through studying the observed data of typical section,the scour and silting condition of this section after and before the construction of this reservoir is analyzed in this paper.