Study and application of evaluation method and index system for pre-stage work of dangerous reservoirs reinforcement
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    借助模糊数学理论,提出了水库加固前期工作成效的评价方法,针对加固前期工作中涉及的大坝安全鉴定、初步设计、施工图设计、招投标等相关环节提出工程评价指标及评分标准,并结合专家意见,对病险水库除险加固前期工作情况做出相应的评判。通过工程实例分析,参照相关导则规范,结合现场调研,对病险水库加固前期工作满意度作出整体评价。

    Abstract:

    By means of ambiguity and mathematical theory,the evaluation method of the pre-stage work for reservoir reinforcement is put forward.Aimed at the dam safety appraisal,preliminary design,construction drawing design,bidding and other related links involved in the preliminary work of reinforcement,this paper puts forward project evaluation index and scoring standard,and the evaluation of the early work of the reinforcement for dangerous reservoirs is made,combined with expert advice.Through the analysis of project example,the overall evaluation was made on the satisfaction of the early work of the reservoir reinforcement by refering to the relevant guidelines and combining with field research.

    参考文献
    相似文献
    引证文献
引用本文

洪文浩,周清勇,陈结文,万 玲,唐林波,刘小斌.病险水库除险加固前期工作评价方法及指标体系研究与应用[J].江西水利科技,2021,(5):

复制
相关视频

分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-11-04
  • 出版日期:
文章二维码