周 斌.基于极值原理的瞬时单位线法在洪峰求解中的应用研究[J].江西水利科技,2019,(1): |
基于极值原理的瞬时单位线法在洪峰求解中的应用研究 |
Research on the application of the Nash Unit Line method of flood peak calculation based on extreme value principle |
|
DOI: |
中文关键词: 瞬时单位线 洪峰 瞎子爬山法 半分法 |
英文关键词: Nash unit line Flood peak Blind mountain climbing method Semi-divided method |
基金项目: |
|
摘要点击次数: 498 |
全文下载次数: 593 |
中文摘要: |
工程中采用瞬时单位线法计算洪水时,洪峰均是从有限的计算节点上统计最大值作为洪峰,存在一定误差.当有较高精度要求时,不宜仅统计有限计算节点上的洪水最大值作为设计洪峰.采用瞎子爬山法和半分法计算洪峰流量,算法简洁明晰,计算开销有限,收敛速度快,是优良的计算方法,可供广大设计同行参考使用. |
英文摘要: |
When the Nash Unit Line method is used to calculate the flood peak in a project,the maximum value of the flood peak is taken as the flood peak from the limited calculation node,and there is a certain error.When higher accuracy is required,it is not appropriate to count only the maximum flood value at the limited calculation node as the design flood peak.The blind mountain-climbing method and the semi-divided method are excellent methods for calculating flood peak flow,which are simple and clear,have limited calculation overhead and fast convergence speed,and can be used by many design colleagues for reference. |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |