文章摘要
吴庆华.峡江水电站灯泡贯流式水轮发电机组受油器安装[J].江西水利科技,2016,(2):125-131
峡江水电站灯泡贯流式水轮发电机组受油器安装
Installation profile of the oil head in Xiajiang hydropower station bulb tubular turbine generating set
  
DOI:
中文关键词: 峡江水电站  受油器  浮动瓦  安装  烧瓦  漏油  间隙  摆度
英文关键词: Xiajiang  Oil head  Floating tile  Installation  Tile burning  Oil leakage  Clearance  Throw
基金项目:
作者单位
吴庆华 湖南水利水电工程监理承包总公司 
摘要点击次数: 572
全文下载次数: 673
中文摘要:
      本文介绍了灯泡贯流式水轮发电机组受油器的作用、结构、经常出现的事故以及发生事故的原因,以峡江水电站机组为例,对受油器的安装流程、安装工艺、间隙检查调整、盘车摆度检查调整等作了具体介绍,并提出了几点建议,仅供参考。
英文摘要:
      This paper introduces the function, structure, frequent accidents and corresponding reasons of the bulb tubular turbine generating set. Taking the hydropower generating set in Xiajiang as an example, the oil head’s installation process and technique, clearance check adjustment and barring throw test adjustment are detaily introduced. And a few suggestions are made for reference.
查看全文   查看/发表评论  下载PDF阅读器
关闭