本文介绍了灯泡贯流式水轮发电机组受油器的作用、结构、经常出现的事故以及发生事故的原因,以峡江水电站机组为例,对受油器的安装流程、安装工艺、间隙检查调整、盘车摆度检查调整等作了具体介绍,并提出了几点建议,仅供参考。 |
英文摘要: |
This paper introduces the function, structure, frequent accidents and corresponding reasons of the bulb tubular turbine generating set. Taking the hydropower generating set in Xiajiang as an example, the oil head’s installation process and technique, clearance check adjustment and barring throw test adjustment are detaily introduced. And a few suggestions are made for reference. |