万安水库泥沙淤积分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV145

基金项目:


Analysis of sediment accumulation of Wanan Reservoir
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    本文基于万安水库上游主要河流控制站和出库站的来沙情况,对建库前后入、出沙量进行对比,分析建库后泥沙淤积情况;通过研究典型大断面实测资料,分析建库前后断面冲淤情况。

    Abstract:

    Based on the sediment condition of the control station of main rivers in the upstream of Wanan Reservoir and the reservoir outlet station and compared the inlet sediment with the outlet sediment before the construction of this reservoir,the sediment accumulation condition after the construction of this reservoir is analyzed.Through studying the observed data of typical section,the scour and silting condition of this section after and before the construction of this reservoir is analyzed in this paper.

    参考文献
    相似文献
    引证文献
引用本文

陈光平,程爱平.万安水库泥沙淤积分析[J].江西水利科技,2015,(1):8-15

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-07-03
  • 出版日期: